Click Anyone Button Given Below To See Construction Specification
Structure Work @ Rs. 950 Square Feet
Structure work Specification
1. Architecture Service
2.Civil Material Speciation
3.Electric Work Specification
4.Plumbing Work Specification
1. Architecture Service
Architecture Service Specification
- Layout Plan
- Structural Design
- Electrical Design
- Plumbing Design
- Door and Window schedule
- 3d Elevation
- Working Elevation
2.Civil Material Speciation
Civil Material Specification
Steel in Basement Steel on other Floors | TATA / Jindal Steel (8.0 to 9.0 kg Per Sqft), TATA / Jindal Steel (4.0 to 5.0 kg Per Sqft) |
Basement RCC wall | 6” thick RCC Wall with M25 or M30 Concrete with 4.5” brick wall inner side |
Cement | Ultratech / Ambuja or Equivalent |
Bricks & Stone Dust | 1st Quality |
Aggregate | 1st Quality |
Concrete Grade | M25 or ( As per Structural Drawings) |
Plaster Work | Cement, Dust & Sand Plaster |
Anti Trimite | Foundation and Plinth |
Water Proofing (Dr. Fixit) | Basement Toilet, Balcony & Terrace |
3.Electric Work Specification
Electric Work Specification
Slab | Polypack pies, fanbox & concealed lights box |
Walls | Polypack pies with base box |
Switches/Plates/Wiring | N/A |
Split AC Wiring | N/A |
4.Plumbing Work Specification
Plumbing Work Specification
Pipes CPVC (Water Supply), PVC (Waste water, Rainwater pipe & sewerage pipe) | Ashirwad /Astral Prakash/Prince Pipes |
Balcony | Provision of one tap on balcony on each floor |
Provision of one tap on balcony on each floor | 10000 Ltr |
Water Meter | Provision of one water meter as per norms |